NYC DOB record · Q01213391-I1

1735 Harman Street

1735 Harman Street, Queens, NY 11385

New building filing in Ridgewood, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01213391-I1

1735 Harman Street

Queens, NY 11385

New building · status dated Aug 27, 2026

Current record
Approved
Proposed scale
4 stories
Dwelling units
6
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01213391-I1 as a new building at 1735 Harman Street, Queens, NY 11385. Its latest published status category is Approved, dated Aug 27, 2026. The filing records 4 proposed stories and 6 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Aug 27, 2026
Proposed scale
4 proposed stories and 6 proposed dwelling units
The building, not the filingEvery filing at BIN 4860502, with the parcel and violation recordApplicant of recordSee the 62 filings that name Prime Zone Building Consulting
FiledApr 23, 2025
Current recordApproved
Proposed scale4 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Proposed four (4) story new build'g w/ bulkhead, six (6) dwelling units, obtain new certificate of occupancy.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a garage or fuel station on a 2,200 sq ft lot.

Residential units
0
Building type
Garage or fuel station
Land use
Parking facilities
Zoning district
R6B
Lot area
2,200 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01213391-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01213391-I1
BBL
4034320047
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
4
Existing dwelling units
Empty in the source
Proposed dwelling units
6
General construction