What the filing says
A public-record reading of the proposed work.
Installation of temporary work platform per plan. no change in use, egress, or occupancy. the work platform in the cellar over pool, jacuzzi, and cold plunge pools.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 26-story office building built in 1950, on a 29,505 sq ft lot.
- Built
- 1950
- Last altered
- 2017
- Floors
- 26
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C6-6
- Lot area
- 29,505 sq ft
- Building area
- 519,600 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 134 notices on file; the most recent was issued Oct 19, 2021.
- Elevator
Issued Oct 19, 2021
- Immediate
Issued Jul 31, 2020 — PROVIDE APPROXIMATELY 25 LINEAR FEET OF SIDEWALK SHED IMMEDIATELY ON EXPOSURE #1 (2ND AVENUE) AND APPROXIMATELY 20 LINEAR FEET OF SIDEWALK SHED IMMEDIATELY ON EXPOSURE #4 ( EAST 90 STREET) TO SAFEGUARD THE PUBLIC AND PROPERTY
- Sprinkler
Issued Sep 3, 2019 — FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01314369-S6.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01314369-S6
- BBL
- 1010270020
- Postal code
- 10019 · 1382 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








