What the filing says
A public-record reading of the proposed work.
Garage repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 20-story elevator apartment building built in 1974, with 187 homes, on a 30,667 sq ft lot.
- Built
- 1974
- Last altered
- 1986
- Floors
- 20
- Residential units
- 187
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C2-8
- Lot area
- 30,667 sq ft
- Building area
- 233,880 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 11, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 44 notices on file; the most recent was issued Dec 11, 2024.
- Fail to certify class
Issued Dec 11, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued Dec 9, 2024 — VACATE ORDER. OBSERVED.: TWO FLRS ACTIVE PARKING GARAGE CELLAR AND SUB CELLAR: DETERORATED CONCRETE SLABS AND EXPOSED REBARS AT MULTIPLE LOCA AT BOTH LEVELS W/O ADEQUATE PROTECTION FOR SHORING. THESE CONDITIONS HAVE MADE THE ENTIRE PARKING GARAGE STRUCTURE (TWO FLRS) UNABLE TO BE OCCUPIED. REMEDY: VACATE ENTIRE PARKING GARAGE (TWO FLOORS)
- Construction
Issued Aug 13, 2024 — EMERGENCY WORK ORDER-TO RETAIN RDP TO EVALUATE ACTIVE PARKING STRUCTUR CONSIST OF 2 LEVELS (BASEMENT,SUB-BSMT)WITH VEHICLES.SPALLED/CRACKED CONCRETE,SLAB/BEAM/WALL/ EXP REBA.RUSTED REBAR & WITH SHARING SUPPORT REMEDY:TO RETAIN NYS REGISTERED DESIGN PROFESSIONAL TO EVALUATE AND DIRECT PROGRESS REPORT TO PARKINGSTRUCTURES@BUILDINGS.NYC.GOV
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01066937-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,348 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01066937-I1
- BIN
- 1032489
- BBL
- 1012210001
- Postal code
- 10024 · 576 filings
- Review type
- Professional Certification
- Existing stories
- 20
- Proposed stories
- 20
- Existing dwelling units
- 188
- Proposed dwelling units
- 188








