What the filing says
A public-record reading of the proposed work.
Structural design in conjunction with proposed horizontal enlargement. no change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 1925, on a 2,750 sq ft lot.
- Built
- 1925
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R5
- Lot area
- 2,750 sq ft
- Building area
- 1,388 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Jun 2, 2026.
- Construction
Issued Jun 2, 2026 — FAILURE TO MAINTAIN-WOOD EXTENSION PERFORMED AT MULTIPLE LEVELS WITHOU T PERMITS.RECOMMEND STRUCTURAL STABILITY INSPECTIONS.REMEDY:RETAIN PE TO PERFORM STABILITY INSPECTIONS ONCE A MONTH.REPORTS TO BE READILY AV AILABLE UPON REQUEST
- Immediate
Issued Nov 13, 2025 — 1-INSTALLATION OF FENCE AT FRONT AND REAR (EXPO 1 & 3) APPROXIMATELY 25 LF EACH; 2-INSTALLATION OF FENCE AT LEFT AND RIGHT SIDES (EXPOSURES 2 & 4) APPROXIMATELY 100 LF EACH
- Construction
Issued Nov 13, 2025 — REAR EXP 2 AND 3. HORIZONTAL VERTICAL 2 STORY CANTILEVER EXTENSION. 4'WX27'LX20'H. NO DETAILS ON FRAMING LUMBER SIZES, WALL FRAMING ,CONNECTIONS, RIDGE PLATE, FOUNDATION LOADS, CANTILEVER LOADS, ETC. NO PLANS ON FILE.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01322488-S1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01322488-S1
- BIN
- 3176138
- BBL
- 3066380036
- Postal code
- 11223 · 1809 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 1
- Proposed dwelling units
- 1