What the filing says
A public-record reading of the proposed work.
Decommission of existing sprint telecom site. remove all antennas and equipment from the roof. no change in use, egress or occupancy. original installation approved under application # 320438932
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1926, with 105 homes, on a 30,960 sq ft lot.
- Built
- 1926
- Last altered
- 2012
- Floors
- 6
- Residential units
- 105
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R6A
- Lot area
- 30,960 sq ft
- Building area
- 101,034 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 54 notices on file; the most recent was issued Oct 9, 2021.
- Elevator
Issued Oct 9, 2021
- Plumbing
Issued Apr 27, 2018 — THE BOROUGH COMMISSIONER HAS ISSUED A 15 DAY LETTER OF INTENT TO REVOKE ALL PLUMBING WORK UNDER LAA #340544236 DUE TO AUDIT OBJECTIONS
- (other bldgs types) - elevator affirmation of
Issued Jan 3, 2017 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00554177-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00554177-I1
- BIN
- 3177462
- BBL
- 3066630023
- Postal code
- 11223 · 1932 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 104
- Proposed dwelling units
- 104








