What the filing says
A public-record reading of the proposed work.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition, for curing violation # 39554793r
Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story walk-up apartment building built in 1901, with 3 homes, on a 2,483 sq ft lot.
- Built
- 1901
- Last altered
- 2025
- Floors
- 2
- Residential units
- 3
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7-1
- Lot area
- 2,483 sq ft
- Building area
- 3,672 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 7 notices on file; the most recent was issued Aug 22, 2025.
- Immediate
Issued Aug 22, 2025 — SEAL ALL ACCESSIBLE GROUND FLOOR DOORS AND WINDOWS AROUND THE ENTIRE PERIMETER OF THE BUILDING TO PREVENT UNAUTHORIZED ACCESS
- Construction
Issued May 8, 2025 — UNLAWFUL ACTS.FAILURE TO COMPLY W/COMMISSIONER'S ORDER #012924CCER02JK ISSUED ON 1/29/2024. UP TO TODAY'S DATE NO PERMITS HAVE BEEN OBTAINED TO REPAIR STRUCTURALLY COMPROMISED RW. REMEDY:IMMEDIATELY COMPLY W/ COMMISSIONER'S ORDER 012924CCER02JK ISSUED 1/29/2024. RW UNIT, 280 BROADWAY, 4TH FLOOR,NEW YORK,NY 10007, ATT: BILL HALKIADAKIS, P.E
- Construction
Issued Jan 29, 2024 — STRUCTURE RENDERD NON COMPLIANT AT EXPOSURE 3 OF A MULTIPLE DWELLING T HE RETAINING WALL HAS COLLAPSED ALONG WITH THE MAJORITY OF THE REAR YA RD . THE REMAINIONIG EARTH SLOPE IS STILL UNSAFE WITH POTENTIAL OF FUR THER COLLAPSE. OWNER HAS BEEN DIRECTED TO PROVIDE A STRUCTURAL STABILI TY REPORT CITING CONDITIONS
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01102724-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01102724-S1
- BBL
- 2028900016
- Postal code
- 10457 · 264 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- Empty in the source
- Existing dwelling units
- 3
- Proposed dwelling units
- Empty in the source