NYC DOB record · M01416144-P2

176 7 Avenue

176 7 Avenue, Manhattan, NY 10011

Alteration filing in Chelsea-Hudson Yards, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 19, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01416144-P2

176 7 Avenue

Manhattan, NY 10011

Alteration filing · status dated Sep 16, 2026

Current record
Approved
Proposed scale
4 stories
Dwelling units
6
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01416144-P2 as a alteration filing at 176 7 Avenue, Manhattan, NY 10011. Its latest published status category is Approved, dated Sep 16, 2026. The filing records 4 proposed stories and 6 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 16, 2026
Proposed scale
4 proposed stories and 6 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1014035Applicant of recordSee the 14 filings that name James Chai Architect, P.C.
FiledAug 27, 2026
Current recordApproved
Proposed scale4 stories
Recorded cost$311,700

What the filing says

A public-record reading of the proposed work.

Renovation of unit #1b on 2nd flr, #2a, 2b on 3rd flr, #3a, 3b on 4th fr, cellar and common hallways, including removing interior partitions, lighting, & finish work. no change to use, egress or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story mainly residential with some commercial built in 1901, with 6 homes, on a 2,107 sq ft lot.

Built
1901
Floors
4
Residential units
6
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
R8A
Lot area
2,107 sq ft
Building area
3,906 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 5 notices on file; the most recent was issued May 22, 1992.

  • Construction

    Issued May 22, 1992

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01416144-P2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01416144-P2
BBL
1007700039
Review type
Standard Plan Examination
Existing stories
4
Proposed stories
4
Existing dwelling units
6
Proposed dwelling units
6
General construction