NYC DOB record · B01083170-S2

176 Borinquen Place

176 Borinquen Place, Brooklyn, NY 11211

Alteration filing in Williamsburg, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01083170-S2

176 Borinquen Place

Brooklyn, NY 11211

Alteration filing · status dated Sep 22, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
30
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01083170-S2 as a alteration filing at 176 Borinquen Place, Brooklyn, NY 11211. Its latest published status category is Approved, dated Sep 22, 2026. The filing records 6 proposed stories and 30 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 22, 2026
Proposed scale
6 proposed stories and 30 proposed dwelling units
The building, not the filingopen housing violations, apartment sizes, the owner of record and every filing at BIN 3063039Applicant of recordSee the 26 filings that name James Schaefer Architect, P.C
FiledApr 23, 2025
Current recordApproved
Proposed scale6 stories
Recorded cost$30,390

What the filing says

A public-record reading of the proposed work.

Filing for work to fit out drycleaner establishment in existing UG6 space at 01, including boiler room construction at cellar, including new chimney flue. Boiler and PL work types filed separately

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story walk-up apartment building built in 1915, with 26 homes, on a 3,240 sq ft lot.

Built
1915
Floors
6
Residential units
26
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
3,240 sq ft
Building area
19,422 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 12 open notices on record for this building, out of 16 notices on file; the most recent was issued Sep 23, 2024.

  • High pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION

  • 9 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01083170-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 69,387 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01083170-S2
BBL
3024120004
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
30
Proposed dwelling units
30
General construction