What the filing says
A public-record reading of the proposed work.
Installation of non-emergency gas fired generator with related gas booster pump on roof. No change to occupancy, use, or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 8-story condominium built in 1926, with 56 homes, on a 8,300 sq ft lot.
- Built
- 1926
- Last altered
- 2004
- Floors
- 8
- Residential units
- 56
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-4
- Lot area
- 8,300 sq ft
- Building area
- 58,424 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 26 open notices on record for this building, out of 98 notices on file; the most recent was issued Aug 21, 2025.
- Construction
Issued Aug 21, 2025 — EWO DUE TO LARGE SECTION OF FACADE STUCCO HAD COLLAPSED @7FL EXP3 S EL DUE TO THIS COLLAPSE THE OWNER IS TO IMMEDIATELY PROVIDE 1)PLOT PLAN W/DIMENSION NOTING AREAS TO BE CLOSED OFF. REMEDY:INSTALL SIDEWALK SHED @ ALL EXPS.RETAIN NYS REGISTERED PE/QEWI TO DIRECT AND SUPERVISE WORK.PE SUBMIT REPORT TO FACADE UNIT. FACADES@BUILDINGS.NYC.GOV
- Construction
Issued Aug 21, 2025 — REQUEST A ENGINEERS REPORT DUE TO EXPOSURE 3(BACK) WALL, 7 FLOOR MISSING SECTION OF STUCCO LARGE HOLE AND 2ND FLOOR BULGING AREA, AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGED CONDITIONS.
- Construction
Issued Aug 21, 2025 — FAILURE TO MAINTAIN FACADE AND APPURTENANCES ON 8/21/25,A LARGE SECTIO N OF FACADE STUCCO AT 7TH FLOOR HAD COLLAPSED ONTO ADJACENT BUILDING 3 43 GOLD STREET DRIVEWAY GARAGE.BELOW FOR REASONS YET TO BE DETERMINED AT EXP3 SOUTH ELEV.REMEDY:OWNER TO RETAIN SERVICES OF A NYS REG DESIGN PROFESSIONAL WITH QEWI CERTIFICATION TO INSPECTION AND EVALUATE
23 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00497649-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00497649-I1
- BBL
- 3020497501
- Postal code
- 11201 · 3965 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 56
- Proposed dwelling units
- 56








