NYC DOB record · B00342974-I1

177 Ardsley Loop

177 Ardsley Loop, Brooklyn, NY 11239

Alteration filing in Spring Creek-Starrett City, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00342974-I1

177 Ardsley Loop

Brooklyn, NY 11239

Alteration filing · status dated Dec 27, 2020

Current record
Recorded as completed
Proposed scale
4 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00342974-I1 as a alteration filing at 177 Ardsley Loop, Brooklyn, NY 11239. Its latest published status category is Recorded as completed, dated Dec 27, 2020. The filing records 4 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Dec 27, 2020
Proposed scale
4 proposed stories
The building, not the filingEvery filing at BIN 3098291, with the parcel and violation recordApplicant of recordSee the 15 filings that name Hirani Engineering & Surveying P.C
FiledMay 11, 2020
Current recordRecorded as completed
Proposed scale4 stories
Recorded cost$50,064

What the filing says

A public-record reading of the proposed work.

Post Approval Amendment being filed to revise plans to show corrected boiler pad dimensions.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story garage or fuel station built in 1972, on a 67,200 sq ft lot.

Built
1972
Floors
4
Residential units
0
Building type
Garage or fuel station
Land use
Parking facilities
Zoning district
R5
Lot area
67,200 sq ft
Building area
240,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 13 open notices on record for this building, out of 32 notices on file; the most recent was issued Dec 26, 2025.

  • Construction

    Issued Dec 26, 2025 — FAILURE TO MAINTAIN BUILDING,AT TIME OF INSPECTION OBSERVED SECTION OF CONCRETE WALL AT 3RD FLOOR AT EXTERIOR APPROXIMATELY 10' X 4' MISSING.

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • 10 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00342974-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04
  5. Current status updated

    The latest recorded filing status is “LOC Issued.”

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00342974-I1
BBL
3044350050
Review type
Professional Certification
Existing stories
4
Proposed stories
4
Existing dwelling units
0
Proposed dwelling units
0
Structural work