What the filing says
A public-record reading of the proposed work.
Heavy duty sidewalk shed related to minor facade repairs. sidewalk shed layout as per plans. no change in use, egress or occupancy under this application. sidewalk shed shall comply with chapter 33 of the 2022 buiilding code.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story garage or fuel station built in 1906, on a 4,087 sq ft lot.
- Built
- 1906
- Floors
- 5
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- R8B
- Lot area
- 4,087 sq ft
- Building area
- 17,232 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 10 notices on file; the most recent was issued May 21, 2026.
- Construction
Issued May 21, 2026 — EMERGENCY WORK ORDER. DUE TO DEFECTIVE FIRE ESCAPE AT EXPOSURE 3 NORTH ELEVATION EXHIBITING SEVERLY DETERIORATING AND CORRODED STEEL COMPONENTS, BRAKEN LANDING AND INADEQUATE TEMPORARY SUPPORTS. REMEDY: OWNER TO IMMEDIATELY STAR REPAIRS OF DEFECTIVE FIRE ESCAPE UNDER FULL TIME SUPERVISION OF NYS REGISTERED PE
- Construction
Issued Jan 23, 2026 — EWO OBSERVD @ EXTERIOR FACADE, EXP4 E.ELEV, BULDGE/LOOSE MASONRY BRICK & LOOSE TERRACOTTA WITH MISSING JOINTS MOTAR CAUSING AN IMMEDIT HAZRD TO VEHCLR/PEDTRN TRAFFIC, REQUIRIG IMMEDIT SAFTY MEAS TO BE IMPLEMTE REMEDY:RETAIN A NYS RDP TO DIRECT/SUPRVE THE IMMEDIT INSTLLATN OF SAFT SAFTY MEAS @ E.ELVE. WORK BE CONDUCTED UNDR F/T SUPRVIN/DAILY REPORTS
- Elevator
Issued Aug 16, 2007
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01355221-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01355221-I1
- BIN
- 1043045
- BBL
- 1014080031
- Postal code
- 10021 · 942 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 0
- Proposed dwelling units
- 0