What the filing says
A public-record reading of the proposed work.
Demolish and renovate the existing cellar floor. remove existing plumbing fixtures and existing gas service including existing boiler with all underground piping in the cellar and replace them with new fixtures, services, underground piping and equipment.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1920, with 12 homes, on a 2,542 sq ft lot.
- Built
- 1920
- Last altered
- 2018
- Floors
- 5
- Residential units
- 12
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C2-8
- Lot area
- 2,542 sq ft
- Building area
- 9,855 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 20 open notices on record for this building, out of 32 notices on file; the most recent was issued Apr 23, 2026.
- Construction
Issued Apr 23, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER SECTION 28.301.1 OF THE NYC ADMIN CODE.NOTED AT TIME OF INSPECTION,EXP2 PARAPE T ELEVATION VERTICAL BRICK CRACKS AND STEP CRACKS CAN BE SEEN FROM THE ROOF.REMEDY:REPAIR AND/OR REPLACE
- Construction
Issued Oct 1, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED CRACKS & DAMAGED MOTAR JOINT AT SEVERAL LEVELS OF EXP#1. OBSERVED DAMAGED, ERODING, MASONRY SILLS & EYE BROWS @ MULTIPLE LEVELS.AT EXP#2 OBSERVED VERTICAL CRACK @ NE CORNER OF EXP 2 & DETERIORATING/SPALLING @ PARAPET LVL @ EXP#4. REMEDY: REPAID AND/OR REPLACE
- Construction
Issued Apr 30, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTE OBSERVED CRACKS AND DAMAGED MORTAR JOINTS AT SEVERAL LOCATIONS.ERODING MASONRY AND EYE BROWS AT MULTIPLE LOCATIONS ON EXP1 WEST ELEV.ALSO OBSERVED SP ALLED STUCCO,VERTICAL CRAC AT NE CORNER OF EXP2 NORTH ELEV AND DETERIO RATING MASONRY AND WINDOW LINTELS AT EXP4 SOUTH.REMEDY:REPAIR OR REPLA
17 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01282936-P1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01282936-P1
- BBL
- 1015550004
- Postal code
- 10128 · 414 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 13
- Proposed dwelling units
- 13