What the filing says
A public-record reading of the proposed work.
Renovation of portion of second floor of existing four story hospital building, including partition & finish work. Work filed under subsequent applications includes mechanical & plumbing. There is no change in use, occupancy or egress in this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story care home built in 1925, on a 24,036 sq ft lot.
- Built
- 1925
- Last altered
- 1958
- Floors
- 4
- Residential units
- 0
- Building type
- Care home
- Land use
- Public facilities and institutions
- Zoning district
- R7-1
- Lot area
- 24,036 sq ft
- Building area
- 43,285 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 27 open notices on record for this building, out of 127 notices on file; the most recent was issued Jul 9, 2025.
- Plumbing
Issued Jul 9, 2025 — BASED ON LIC #001343 BEING INACTIVE, STOP ALL PLUMBING WORK UNDER JOB # 22099916 IMMEDIATELY.
- Failure to post energy
Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
- Low pressure boiler
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
24 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01117806-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,692 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01117806-I1
- BIN
- 2009358
- BBL
- 2028910037
- Postal code
- 10457 · 598 filings
- Review type
- Standard Plan Examination
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








