NYC DOB record · B01077912-P8

178 Throop Avenue

178 Throop Avenue, Brooklyn, NY 11206

New building filing in Bedford-Stuyvesant (West), Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 22, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01077912-P8

178 Throop Avenue

Brooklyn, NY 11206

New building · status dated Aug 24, 2026

Current record
Approved
Proposed scale
7 stories
Dwelling units
7
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01077912-P8 as a new building at 178 Throop Avenue, Brooklyn, NY 11206. Its latest published status category is Approved, dated Aug 24, 2026. The filing records 7 proposed stories and 7 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Aug 24, 2026
Proposed scale
7 proposed stories and 7 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3430639Applicant of recordSee the 75 filings that name Mehandes Engineering
FiledJul 29, 2026
Current recordApproved
Proposed scale7 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Sprinkler application filed subsequent to NB application: B01077912-I1.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story elevator apartment building built in 2025, with 7 homes, on a 2,917 sq ft lot.

Built
2025
Last altered
2024
Floors
7
Residential units
7
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6A
Lot area
2,917 sq ft
Building area
13,045 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01077912-P8.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01077912-P8
BBL
3017260132
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
7
Existing dwelling units
Empty in the source
Proposed dwelling units
7