NYC DOB record · X01408526-I1

18 East 198 Street

18 East 198 Street, Bronx, NY 10468

Alteration filing in Bedford Park, Bronx. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 27, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01408526-I1

18 East 198 Street

Bronx, NY 10468

Alteration filing · status dated Sep 25, 2026

Current record
Recorded as completed
Proposed scale
6 stories
Dwelling units
25
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01408526-I1 as a alteration filing at 18 East 198 Street, Bronx, NY 10468. Its latest published status category is Recorded as completed, dated Sep 25, 2026. The filing records 6 proposed stories and 25 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 25, 2026
Proposed scale
6 proposed stories and 25 proposed dwelling units
Applicant of recordSee the 4 filings that name Dennis V. Panettieri, Architect
FiledJun 1, 2026
Current recordRecorded as completed
Proposed scale6 stories
Recorded cost$45,000

What the filing says

A public-record reading of the proposed work.

Filed to repair damage steel lintels over windows and repair existing damage parapet walls in existing six story brick multiple dwelling at the premises. also to comply with DOB violation 051326cfa0701ae and 032126cfa0702dd

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1929, with 25 homes, on a 5,006 sq ft lot.

Built
1929
Floors
6
Residential units
25
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R8
Lot area
5,006 sq ft
Building area
26,100 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 27, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 12 open notices on record for this building, out of 36 notices on file; the most recent was issued May 13, 2026.

  • Construction

    Issued May 13, 2026 — EMERGENCY WORK ORDER DUE TO CRACKED/SPALLING BRICKS/MORTAR JOINTS AT EXP#3 (SOUTH ELEV) & EXP#4 (WEST ELEV) AT VARIOUS LOCATIONS. REMEDY: IMMEDIATELY TAKE,PROVIDE SAFETY MEASURES TO SECURE/PROTEC THE PUBLIC AT SOUTH & WEST ELEVATION UNDER FULL SUPERVISION OF NYC LICENSED PROFESSIONAL

  • Construction

    Issued Mar 21, 2026 — EWO DUE TO CRACKED/DISPLACED BRICK @ NORTHEAST CORNER 6FL LVL OVERLOOK ADJACENT PROPERTY. CONDITION CONSITUTES IMMINENT HAZARD TO PUBLIC REMEDY:IMMEDIATELY TAKE/PROVIDE ADEQUATE SAFETY MEASURES TO SECURE/ PROTECT PUBLIC. INSTALL PUBLIC PROTECTION NE EXP1, 2EAST. MAKE REPAIRS U/FULL SUPERVISION OF A NYS LICENSED PROFESSIONAL

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION

  • 9 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 27, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01408526-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,086 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01408526-I1
BIN
2017539
BBL
2033180119
Review type
Professional Certification
Existing stories
6
Proposed stories
6
Existing dwelling units
25
Proposed dwelling units
25
General construction