What the filing says
A public-record reading of the proposed work.
Filed to repair damage steel lintels over windows and repair existing damage parapet walls in existing six story brick multiple dwelling at the premises. also to comply with DOB violation 051326cfa0701ae and 032126cfa0702dd
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1929, with 25 homes, on a 5,006 sq ft lot.
- Built
- 1929
- Floors
- 6
- Residential units
- 25
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8
- Lot area
- 5,006 sq ft
- Building area
- 26,100 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 27, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 12 open notices on record for this building, out of 36 notices on file; the most recent was issued May 13, 2026.
- Construction
Issued May 13, 2026 — EMERGENCY WORK ORDER DUE TO CRACKED/SPALLING BRICKS/MORTAR JOINTS AT EXP#3 (SOUTH ELEV) & EXP#4 (WEST ELEV) AT VARIOUS LOCATIONS. REMEDY: IMMEDIATELY TAKE,PROVIDE SAFETY MEASURES TO SECURE/PROTEC THE PUBLIC AT SOUTH & WEST ELEVATION UNDER FULL SUPERVISION OF NYC LICENSED PROFESSIONAL
- Construction
Issued Mar 21, 2026 — EWO DUE TO CRACKED/DISPLACED BRICK @ NORTHEAST CORNER 6FL LVL OVERLOOK ADJACENT PROPERTY. CONDITION CONSITUTES IMMINENT HAZARD TO PUBLIC REMEDY:IMMEDIATELY TAKE/PROVIDE ADEQUATE SAFETY MEASURES TO SECURE/ PROTECT PUBLIC. INSTALL PUBLIC PROTECTION NE EXP1, 2EAST. MAKE REPAIRS U/FULL SUPERVISION OF A NYS LICENSED PROFESSIONAL
- Low pressure boiler
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
9 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 27, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01408526-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,086 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01408526-I1
- BIN
- 2017539
- BBL
- 2033180119
- Postal code
- 10468 · 153 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 25
- Proposed dwelling units
- 25








