NYC DOB record · M01456981-S1

18 East 50 Street

18 East 50 Street, Manhattan, NY 10022

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01456981-S1

18 East 50 Street

Manhattan, NY 10022

Alteration filing · status dated Sep 15, 2026

Current record
Approved
Proposed scale
11 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01456981-S1 as a alteration filing at 18 East 50 Street, Manhattan, NY 10022. Its latest published status category is Approved, dated Sep 15, 2026. The filing records 11 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 15, 2026
Proposed scale
11 proposed stories
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1035460Applicant of recordSee the 4 filings that name Frank Denner Architect
FiledSep 14, 2026
Current recordApproved
Proposed scale11 stories
Recorded cost$45,000

What the filing says

A public-record reading of the proposed work.

Remove and capp plumbing fixtures on 7th and 8th floor in existing office space . all as per plan.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 11-story office building built in 1916, on a 5,640 sq ft lot.

Built
1916
Last altered
1984
Floors
11
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
5,640 sq ft
Building area
58,342 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 46 notices on file; the most recent was issued Sep 3, 2019.

  • Sprinkler

    Issued Sep 3, 2019 — FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019

  • Construction

    Issued Oct 18, 1991

  • Construction

    Issued Oct 18, 1991

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01456981-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01456981-S1
BBL
1012850059
Review type
Professional Certification
Existing stories
11
Proposed stories
11
Existing dwelling units
0
Proposed dwelling units
0