NYC DOB record · B00539066-I1

18 Havemeyer Street

18 Havemeyer Street, Brooklyn, NY 11211

Alteration filing in Williamsburg, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00539066-I1

18 Havemeyer Street

Brooklyn, NY 11211

Alteration filing · status dated Jan 24, 2025

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00539066-I1 as a alteration filing at 18 Havemeyer Street, Brooklyn, NY 11211. Its latest published status category is Recorded as completed, dated Jan 24, 2025. The filing records 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Jan 24, 2025
Proposed scale
3 proposed dwelling units
The building, not the filingEvery filing at BIN 3061992, with the parcel and violation recordApplicant of recordSee the 93 filings that name H2h Group
FiledJun 15, 2021
Current recordRecorded as completed
Proposed scale3 units
Recorded cost$12,125

What the filing says

A public-record reading of the proposed work.

INSTALLATION OF APPROXIMATELY +/- 97LF - 12'W x 10'H TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS, FOR PARAPET REPAIRS AND ROOFING REPLACEMENT WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story walk-up apartment building built in 1899, with 3 homes, on a 1,875 sq ft lot.

Built
1899
Floors
3
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
M1-2/R6A
Lot area
1,875 sq ft
Building area
3,750 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 14 notices on file; the most recent was issued Oct 4, 2023.

  • Construction

    Issued Oct 4, 2023 — FAILURE TO MAINTAIN BUILDING IN A CODE COMLIANT MANNER.AS NOTED BUILDI BUILDING HAS STEP CRACKING ON THE FACADE AND UNFINISHED MASONRY WORK O ON THE PARAPET WALL AS OF 10/04/23 ALSO CRACKED WINDOW SILLS.REMEDY: MAINTAIN BUILDING FACADE IN A CODE COMPLIANT MANNER

  • Construction

    Issued Sep 23, 2021 — AT TIME OF INSPECTION OBSERVED CHIMNEY EXHAUST AT EXPOSURE #2 OF PREMISES IS 4 FT FROM ADJACENT PROPERTY (20 HAVEWEYER ST) REAR ON EXPOSURE #3 WINDOWS AND BALCONY. NB PERMIT #321693253 ; SIGNED OFF 04/07/2021 WAS ISSUED TO 20 HAVEWEYER ST. AS PER BC 2113.1.6.1 IT S THE RESPONSIBILITY OF OWNER OF TALLER BUILDING.

  • Fail to certify class

    Issued Feb 17, 2021 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00539066-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00539066-I1
BBL
3023220018
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
3
Proposed dwelling units
3
Sidewalk shed