NYC DOB record · S00979784-P2

18 Peru Street

18 Peru Street, Staten Island, NY 10314

Alteration filing in Todt Hill-Emerson Hill-Lighthouse Hill-Manor Heights, Staten Island. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 22, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S00979784-P2

18 Peru Street

Staten Island, NY 10314

Alteration filing · status dated Oct 20, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S00979784-P2 as a alteration filing at 18 Peru Street, Staten Island, NY 10314. Its latest published status category is Approved, dated Oct 20, 2026. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 20, 2026
Proposed scale
1 proposed dwelling unit
The building, not the filingopen housing violations, the owner of record and every filing at BIN 5023212Applicant of recordSee the 59 filings that name Steven R. Savino Architect PC
FiledOct 19, 2026
Current recordApproved
Proposed scale1 units
Recorded cost$102,500

What the filing says

A public-record reading of the proposed work.

Installation of plumbing fixtures on all floors.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story one-family home built in 2025, on a 8,000 sq ft lot.

Built
2025
Floors
2
Residential units
1
Building type
One-family home
Land use
One and two family homes
Zoning district
R1-2
Lot area
8,000 sq ft
Building area
3,855 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S00979784-P2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S00979784-P2
BBL
5009180004
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
1