NYC DOB record · S00873490-S2

18 Tottenville Place

18 Tottenville Place, Staten Island, NY 10307

New building filing in Tottenville-Charleston, Staten Island. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 30, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S00873490-S2

18 Tottenville Place

Staten Island, NY 10307

New building · status dated Sep 28, 2026

Current record
Approved
Proposed scale
2 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S00873490-S2 as a new building at 18 Tottenville Place, Staten Island, NY 10307. Its latest published status category is Approved, dated Sep 28, 2026. The filing records 2 proposed stories and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Sep 28, 2026
Proposed scale
2 proposed stories and 1 proposed dwelling unit
Applicant of recordSee the 80 filings that name Rogers Calvanico Group PLLC
FiledSep 26, 2024
Current recordApproved
Proposed scale2 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Intallation of new plumbing fixtures

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S00873490-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 72,082 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S00873490-S2
BIN
5176105
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
2
Existing dwelling units
Empty in the source
Proposed dwelling units
1