What the filing says
A public-record reading of the proposed work.
File suspended scaffold outrigger systems for facade restoration and inspection.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story health facility built in 1920, with 48 homes, on a 3,637 sq ft lot.
- Built
- 1920
- Last altered
- 1986
- Floors
- 6
- Residential units
- 48
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- C1-6A
- Lot area
- 3,637 sq ft
- Building area
- 18,190 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 60 notices on file; the most recent was issued Nov 20, 2024.
- Construction
Issued Nov 20, 2024 — EMERGENCY WORK ORDER DUE TO THE UNSAFE FIRE ESCAPE AT REAL SOUTH FACAD IS MISSING GUARD RAILS @ 3FL PLATFORM & IS MISSING TREADS @ ALL STAIRS BTWN PLATFORM.REMEDY:IMMEDIATELY HIRE 2/4 FOI FIRE GUARDS TO REPAIR FIRE ESCAPE U/DIRECTION LIC DESIGN PROF. FILE PERMIT APPLIC TO DOB WITHIN 2 BUS DAYS. PHOTOS TO FACADES@BUILDINGS.NYC.GOV
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
- Facade safety program
Issued Jul 1, 2019
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01349046-P1.
- Current status updated02
The latest recorded filing status is “Pending Plan Examiner Assignment.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01349046-P1
- BBL
- 1006040003
- Postal code
- 10014 · 435 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








