NYC DOB record · M01009949-I1

181 East 65 Street

181 East 65 Street, Manhattan, NY 10065

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 26, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01009949-I1

181 East 65 Street

Manhattan, NY 10065

Alteration filing · status dated Sep 23, 2026

Current record
Recorded as completed
Proposed scale
32 stories
Dwelling units
89
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01009949-I1 as a alteration filing at 181 East 65 Street, Manhattan, NY 10065. Its latest published status category is Recorded as completed, dated Sep 23, 2026. The filing records 32 proposed stories and 89 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 23, 2026
Proposed scale
32 proposed stories and 89 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1042429Applicant of recordSee the 5 filings that name Bodnar Architect PC
FiledFeb 29, 2024
Current recordRecorded as completed
Proposed scale32 stories
Recorded cost$29,850

What the filing says

A public-record reading of the proposed work.

Removal and relocation of interior partitions with related removal and replacement of ceiling and floor finishes with replacement of bathroom and kitchen plumbing fixtures and appliances in Apt 18B on the 18th Floor. No change in occupancy use or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 32-story condominium built in 2000, with 93 homes, on a 11,930 sq ft lot.

Built
2000
Floors
32
Residential units
93
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C1-9
Lot area
11,930 sq ft
Building area
209,853 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 17 open notices on record for this building, out of 149 notices on file; the most recent was issued Dec 1, 2023.

  • Failure to post energy

    Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • 14 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01009949-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,086 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01009949-I1
BBL
1014007501
Review type
Standard Plan Examination
Existing stories
32
Proposed stories
32
Existing dwelling units
89
Proposed dwelling units
89
General construction