What the filing says
A public-record reading of the proposed work.
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 30-story condominium built in 2003, with 94 homes, on a 8,018 sq ft lot.
- Built
- 2003
- Floors
- 30
- Residential units
- 94
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C1-9
- Lot area
- 8,018 sq ft
- Building area
- 178,063 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 24 open notices on record for this building, out of 59 notices on file; the most recent was issued Feb 24, 2022.
- Construction
Issued Feb 24, 2022 — FAILURE TO MAINTAIN FACADE AND APPURTENANCES DUE TO REPRT FILED LOSS ALUMINIUM PNLS&EXPO#4(3RD AVE)REMEDY:OWNER IS TO IMMMED.RETAIN SERVICE OF NYS PE WITH MASONRY FACADE RESTORATION&REPAIR.EXPERIENCE TO INSPECT &EVALUATE 100% OF (HANDS ON SOUND)AT EXPOSURE TO DETERMINE SAFETY OF SAME&CAUSE OF LOSS ALUMINUM PNLS.CREATE&SUBMIT REPORT BY 03/17/2022
- Low pressure boiler
Issued Nov 8, 2019 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
- Low pressure boiler
Issued Apr 6, 2018 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
21 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00881135-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,982 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00881135-I1
- BIN
- 1048263
- BBL
- 1015197501
- Postal code
- 10128 · 500 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 100
- Proposed dwelling units
- 100