What the filing says
A public-record reading of the proposed work.
General Construction to support an Electrical System upgrade in an existing building. No change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1928, with 41 homes, on a 9,110 sq ft lot.
- Built
- 1928
- Last altered
- 1986
- Floors
- 6
- Residential units
- 41
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8B
- Lot area
- 9,110 sq ft
- Building area
- 38,094 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 15 notices on file; the most recent was issued May 5, 2020.
- Construction
Issued May 5, 2020 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION, DAMAGE OBSERVED TO HAVE BEEN TO WEST COURTYARD DUE TO MASONRY DEBRIS FALLING FROM ADJACENT BUILDING ( 179 EAST 93 STREET, MN ) EXTERIOR FACADE WALL AT EXPO # 04 AT 181 EAST 93 STREET MN. A PARTIAL VACATE ORDER ISSUE ON ENTIRE WEST COURTYARD AS POTENTIAL COLLAPSE ZONE.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01186335-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 69,387 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01186335-P1
- BBL
- 1015220030
- Postal code
- 10128 · 298 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 42
- Proposed dwelling units
- 42