NYC DOB record · S01204767-S1

182 Fillmore Street

182 Fillmore Street, Staten Island, NY 10301

Alteration filing in St. George-New Brighton, Staten Island. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S01204767-S1

182 Fillmore Street

Staten Island, NY 10301

Alteration filing · status dated Nov 17, 2026

Current record
Approved
Proposed scale
2 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S01204767-S1 as a alteration filing at 182 Fillmore Street, Staten Island, NY 10301. Its latest published status category is Approved, dated Nov 17, 2026. The filing records 2 proposed stories and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 17, 2026
Proposed scale
2 proposed stories and 1 proposed dwelling unit
The building, not the filingwhat it sold for and every filing at BIN 5147222Applicant of recordSee the 262 filings that name Nyx Engineering, PLLC
FiledJun 2, 2025
Current recordApproved
Proposed scale2 stories
Recorded cost$45,000

What the filing says

A public-record reading of the proposed work.

Subsequent filing for plumbing work for the interior renovation of existing two-story building with cellar. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story one-family home built in 2004, on a 2,491 sq ft lot.

Built
2004
Last altered
2024
Floors
2
Residential units
1
Building type
One-family home
Land use
One and two family homes
Zoning district
R3X
Lot area
2,491 sq ft
Building area
1,245 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 20, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S01204767-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S01204767-S1
BBL
5000660140
Review type
Standard Plan Examination
Existing stories
2
Proposed stories
2
Existing dwelling units
1
Proposed dwelling units
1