What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story condominium built in 1901, with 5 homes, on a 4,267 sq ft lot.
- Built
- 1901
- Last altered
- 2020
- Floors
- 4
- Residential units
- 5
- Building type
- Condominium
- Land use
- Walk-up apartments
- Zoning district
- R6B
- Lot area
- 4,267 sq ft
- Building area
- 8,420 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Mar 15, 2019.
- Construction
Issued Mar 15, 2019 — FTM:3ST+B BLDG SUFFERED FIRE DMG ON 3/14/19 FIRE AND WATER DMG NOTED THRUGHOUT 3RD FLOOR CORNICE@FRNT WALL PART COLLAP&THE REMAINDER IS IN DANGER OF COLLAP MISSING WINDOWS@3RD FLOOR OWNER TO ENGAGE A LICENSED PE&CONTR TO EVALUATE AND REPAIR THE BLDG UNDER PERMIT FILE FOR PERMIT FOR REPAIR WORK NO LATER THAN 4/15/19 START NO LATER THAN 5/15/19
- Construction
Issued Mar 15, 2019 — EMG WRK:3ST+B+C ATTACH RESID BLDG THAT SUFFER DMG DUE TO FIRE ON 3/14/ 19 FIRE&WATER DMG NOTED THRUGHOUT 3FL CORNICE&FRONT WALL PART COLLAP& THE REMAINDER IS IN DANGER OF COLLAP OWN TO IMMED INST SIDEWALK SHED OR ENGAGE LICENSED CONTR&PE TO REMOVE THE REMAINDER OF THE CORNICE START BY 3/16/19 FILE BY 3/20/19
- Construction
Issued Mar 14, 2019 — .DUE TO FIRE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00145530-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00145530-I1
- BBL
- 3020737502
- Postal code
- 11205 · 2219 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








