NYC DOB record · B01429313-I1

183 Nassau Avenue

183 Nassau Avenue, Brooklyn, NY 11222

Alteration filing in Greenpoint, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 6, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01429313-I1

183 Nassau Avenue

Brooklyn, NY 11222

Alteration filing · status dated Oct 2, 2026

Current record
Approved
Proposed scale
3 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01429313-I1 as a alteration filing at 183 Nassau Avenue, Brooklyn, NY 11222. Its latest published status category is Approved, dated Oct 2, 2026. The filing records 3 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 2, 2026
Proposed scale
3 proposed stories and 2 proposed dwelling units
The building, not the filingopen housing violations and every filing at BIN 3066327Applicant of recordSee the 31 filings that name Consulting Engineer
FiledJul 16, 2026
Current recordApproved
Proposed scale3 stories
Recorded cost$89,904

What the filing says

A public-record reading of the proposed work.

Application filed for PERMANENT REPAIRS to rebuild party wall between buildings 181 & 183 Nassau Avenue and reinforce existing floor joists as per plans. Plans have been submitted and reviewed by DOB CSE unit. No change in use occupancy or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story mainly residential with some commercial built in 1910, on a 1,350 sq ft lot.

Built
1910
Floors
3
Residential units
2
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
R6B
Lot area
1,350 sq ft
Building area
3,240 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 6, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 12 open notices on record for this building, out of 12 notices on file; the most recent was issued Apr 2, 2026.

  • Construction

    Issued Apr 2, 2026 — ON 3/31/2026,UNPERMITTED DEMO OF PARTY WALL AT 181/183 NASSAU AVENUE,B K.UNDOCUMENTED SHORING AND ALTERED JOISTS.NO FILINGS.HAZARD TO PUBLIC AND PROPERTY.REMEDY:RETAIN PE TO SUBMIT PLANS BY 4/10/2026.PERMIT BY 4 /17/2026,START BY 4/20/2026.EMAIL CSE.WORK PER APPROVED FILINGS

  • Construction

    Issued Apr 1, 2026 — DOB VIOLATION ISSUED FOR FAILURE TO MAITAIN, VACATE ORDER ISSUED, FOR PARTY WALL REMOVED AND TEMPORARILY SUPPORTED BY SCREW JACKS AT BASEMENT & 1ST FLOOR.

  • Construction

    Issued Mar 31, 2026 — VIOLATION ISSUED FOR ENGINEERS REPORT FAILURE TO MAINTAIN DUE TO PARTY WALL REMOVED AND TEMPORARILY SUPPORTED BY SCREW JACKS.

  • 9 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 6, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01429313-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01429313-I1
BBL
3026520026
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
3
Existing dwelling units
2
Proposed dwelling units
2
General constructionStructural work