What the filing says
A public-record reading of the proposed work.
File plumbing work application for the removal of all bathroom, kitchen and gas fixtures and cap related piping to address oath/ecb violation no. 39188824n. proposed plumbing layout is filed under b01307238-s4.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story walk-up apartment building built in 1910, with 4 homes, on a 2,200 sq ft lot.
- Built
- 1910
- Floors
- 3
- Residential units
- 4
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6
- Lot area
- 2,200 sq ft
- Building area
- 3,520 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 4 notices on file; the most recent was issued Mar 22, 2024.
- Construction
Issued Mar 22, 2024 — OBSERVED INTERIOR STAIRCASE LEADING FROM FIRST INTO CELLAR APT (1B) & THE CREATION OF A FULL BATHROOM W/ 3 PIECE FIXTURES AS WELL AS RECESS LIGHTING IN APT 1B & CELLAR AREA
- Construction
Issued Oct 24, 2022 — OBSERVED 2 STORY REAR EXTENSION ATTACHED TO THE MAIN DWELLING @ EXPO # 3. THE EXTENSION IS APPROX. FULL WIDTH OF THE PROPERTY & PROJECTING AP PROX 30' LONG FROM THE DWELLING & ALSO APPROX 8' AWAY FROM THE PROPERT Y LINE. THIS ADDITION CONSIST OF TWO LARGE ROOMS ON THE BASEMENT LEVEL - AKA STORAGE AREA, & APT ABOVE ON 1ST FL- AKA APT 1B
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01409652-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01409652-I1
- BBL
- 3024070041
- Postal code
- 11211 · 3571 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 3
- Proposed dwelling units
- 3








