NYC DOB record · M00922018-I1

183 Thompson Street

183 Thompson Street, Manhattan, NY 10012

Alteration filing in Greenwich Village, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00922018-I1

183 Thompson Street

Manhattan, NY 10012

Alteration filing · status dated Aug 26, 2026

Current record
Recorded as completed
Proposed scale
7 stories
Dwelling units
55
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00922018-I1 as a alteration filing at 183 Thompson Street, Manhattan, NY 10012. Its latest published status category is Recorded as completed, dated Aug 26, 2026. The filing records 7 proposed stories and 55 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 26, 2026
Proposed scale
7 proposed stories and 55 proposed dwelling units
FiledAug 21, 2023
Current recordRecorded as completed
Proposed scale7 stories
Recorded cost$1.7M

What the filing says

A public-record reading of the proposed work.

Facade restoration including brick replacement, brick re-pointing, stone patching, & parapet reconstruction.the scope of work also include caulking, window sill, lintel, bulkhead roof, bulkhead skyligh replacement. no change in use, occupancy, or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story walk-up apartment building built in 1908, with 55 homes, on a 5,708 sq ft lot.

Built
1908
Last altered
1985
Floors
7
Residential units
55
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7-2
Lot area
5,708 sq ft
Building area
28,623 sq ft
Historic district
South Village Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 14 open notices on record for this building, out of 16 notices on file; the most recent was issued Apr 13, 2022.

  • Failure to correct swarmp conditions (facade)

    Issued Apr 13, 2022 — CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS

  • Hazardous condition (facade)

    Issued Apr 13, 2022 — CYCLE 9A UNSAFE REPORT FILED

  • No report and / or late filing (facade)

    Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022

  • 11 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00922018-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00922018-I1
BIN
1008249
BBL
1005250016
Review type
Standard Plan Examination
Existing stories
7
Proposed stories
7
Existing dwelling units
55
Proposed dwelling units
55
General construction