What the filing says
A public-record reading of the proposed work.
Facade restoration including brick replacement, brick re-pointing, stone patching, & parapet reconstruction.the scope of work also include caulking, window sill, lintel, bulkhead roof, bulkhead skyligh replacement. no change in use, occupancy, or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story walk-up apartment building built in 1908, with 55 homes, on a 5,708 sq ft lot.
- Built
- 1908
- Last altered
- 1985
- Floors
- 7
- Residential units
- 55
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7-2
- Lot area
- 5,708 sq ft
- Building area
- 28,623 sq ft
- Historic district
- South Village Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 14 open notices on record for this building, out of 16 notices on file; the most recent was issued Apr 13, 2022.
- Failure to correct swarmp conditions (facade)
Issued Apr 13, 2022 — CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
- Hazardous condition (facade)
Issued Apr 13, 2022 — CYCLE 9A UNSAFE REPORT FILED
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
11 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00922018-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00922018-I1
- BIN
- 1008249
- BBL
- 1005250016
- Postal code
- 10012 · 320 filings
- Review type
- Standard Plan Examination
- Existing stories
- 7
- Proposed stories
- 7
- Existing dwelling units
- 55
- Proposed dwelling units
- 55