What the filing says
A public-record reading of the proposed work.
Replacement of existing boiler with new direct vented boiler in cellar utility room. no change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2.5-story one-family home built in 2002, on a 3,150 sq ft lot.
- Built
- 2002
- Floors
- 2.5
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R5
- Lot area
- 3,150 sq ft
- Building area
- 5,400 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Dec 13, 2024.
- Construction
Issued Dec 13, 2024 — FAILURE TO MAINTAIN BLDG IN SAFE CONDITION.DUE TO FIRE@ 1834 EAST 4TH STREET,BK AS A RESULT OF UNPERMITTD ON 12/12/24,THE FIRE SPREAD TO THE 1830 EAST 4TH ST BLDG.FIRE/FIRE FIGHTNG OPS DMGD 1830 BLDG.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS.BLDG TO BE RPAIRD UNDR PRMT STRTNG BY 1/27/25&CMPLTD/SGND OFF BY 3/14
- Construction
Issued Dec 12, 2024 — DOB SUMMONS ISSUED FOR STRUCTURE RENDERED NON COMPLIANT DUE TO EXTENSIVE FIRE, SMOKE AND WATER DAMAGE THROUGHOUT STRUCTURE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01484163-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01484163-I1
- BIN
- 3177302
- BBL
- 3066600029
- Postal code
- 11223 · 2021 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 1