NYC DOB record · B01435299-I1

184 Lincoln Place

184 Lincoln Place, Brooklyn, NY 11217

Alteration filing in Park Slope, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01435299-I1

184 Lincoln Place

Brooklyn, NY 11217

Alteration filing · status dated Aug 27, 2026

Current record
Approved
Proposed scale
4 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01435299-I1 as a alteration filing at 184 Lincoln Place, Brooklyn, NY 11217. Its latest published status category is Approved, dated Aug 27, 2026. The filing records 4 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 27, 2026
Proposed scale
4 proposed stories and 2 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3024484Applicant of recordSee the 30 filings that name Architecture+construction, PLLC
FiledAug 20, 2026
Current recordApproved
Proposed scale4 stories
Recorded cost$146,800

What the filing says

A public-record reading of the proposed work.

Construct new stair to roof in new stair bulkhead. construct occupiable roof terrace for existing duplex dwelling unit at 2nd & 3rd fl. passive recreation rooftop terrace, accessory to residential use per bb 2018-002. no change to use, egress or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story condominium built in 1920, on a 2,083 sq ft lot.

Built
1920
Last altered
2003
Floors
3
Residential units
2
Building type
Condominium
Land use
Walk-up apartments
Zoning district
R7B
Lot area
2,083 sq ft
Building area
4,501 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01435299-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01435299-I1
BBL
3010617503
Review type
Professional Certification
Existing stories
4
Proposed stories
4
Existing dwelling units
2
Proposed dwelling units
2
General constructionStructural work