What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story condominium built in 1900, on a 6,000 sq ft lot.
- Built
- 1900
- Floors
- 3
- Residential units
- 0
- Building type
- Condominium
- Zoning district
- R6
- Lot area
- 6,000 sq ft
- Building area
- 23,802 sq ft
- Historic district
- Cobble Hill Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 25 notices on file; the most recent was issued Feb 11, 2026.
- Construction
Issued Feb 11, 2026 — EMERGENCY WORK ORDER.AT TIME OF INSPECTION ON AN OCCUPIED PS CONSISTIN G OF 5 STORY BUILDING,OBSERVED CRACKED BRICK FACADE WALL,SPALLED MISSI NG MORTAR,SPALLED BRICKS,MISSING BRICKS AMIST AT EXP1 SOUTH,EXP2 WEST, EXP3 NORTH,EXP4 EAST.CRACKED PARAPET WALL AT ROOF CAUSING HAZARD.REMED Y:OWNER TO RETAIN A NYC LIC PROFESSIONAL TO SUPERVISE INSTALLATION
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01400134-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01400134-I1
- BBL
- 3002867502
- Postal code
- 11201 · 5788 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 0
- Proposed dwelling units
- 0