NYC DOB record · M07997436-I1

1854 7 Avenue

1854 7 Avenue, Manhattan, NY 10026

Alteration filing in Harlem (South), Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 18, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M07997436-I1

1854 7 Avenue

Manhattan, NY 10026

Alteration filing · status dated Sep 16, 2026

Current record
Recorded as completed
Proposed scale
7 stories
Dwelling units
28
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M07997436-I1 as a alteration filing at 1854 7 Avenue, Manhattan, NY 10026. Its latest published status category is Recorded as completed, dated Sep 16, 2026. The filing records 7 proposed stories and 28 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 16, 2026
Proposed scale
7 proposed stories and 28 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1055117Applicant of recordSee the 19 filings that name PVE Engineering
FiledOct 13, 2022
Current recordRecorded as completed
Proposed scale7 stories
Recorded cost$38,000

What the filing says

A public-record reading of the proposed work.

Exterior facade restoration as per plans filed herewith. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story elevator apartment building built in 1920, with 28 homes, on a 5,000 sq ft lot.

Built
1920
Last altered
1986
Floors
7
Residential units
28
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-2
Lot area
5,000 sq ft
Building area
27,510 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 24 notices on file; the most recent was issued Jul 31, 2018.

  • No report and / or late filing (facade)

    Issued Jul 31, 2018 — FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018

  • Facade safety program

    Issued Mar 2, 2018

  • (other bldgs types) - elevator affirmation of

    Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M07997436-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M07997436-I1
BBL
1018280030
Review type
Professional Certification
Existing stories
7
Proposed stories
7
Existing dwelling units
28
Proposed dwelling units
28
General construction