What the filing says
A public-record reading of the proposed work.
Proposed interior renovation of apt 2a. partitions as per plan. no change to use, occupancy or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 1900, with 29 homes, on a 7,000 sq ft lot.
- Built
- 1900
- Last altered
- 2017
- Floors
- 7
- Residential units
- 29
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 7,000 sq ft
- Building area
- 40,387 sq ft
- Historic district
- Brooklyn Heights Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 35 notices on file; the most recent was issued May 4, 2007.
- Construction
Issued May 4, 2007 — DEMOLITION WORK CONTRARY TO APPROVED PLANS,APP # 301905936 APPROVED ON 3/10/05.NON-CONFORMING WORK NOTED:FIRE RETARDATION FOR CEILING THROUGH OUT 4C & 4D HAD BEEN REMOVED,FLOOR COVERING REMOVED VARIOUS LOCATION 2 APT.CONTRARY TO SHEET #3 OF DEMO PLANS,DOES NOT SHOW REMOVAL OF FL OR CEILING.REMEDY:STOP ALL WORK,FILE P.A.A.CONFORM TO PLANS,CALL D.O.B
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00581235-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00581235-P1
- BBL
- 3002360018
- Postal code
- 11201 · 5700 filings
- Review type
- Standard Plan Examination
- Existing stories
- 8
- Proposed stories
- 8
- Existing dwelling units
- 29
- Proposed dwelling units
- 29








