NYC DOB record · M01086021-I1

1871 Adam Clayton Powell Jr Boulevard

1871 Adam Clayton Powell Jr Boulevard, Manhattan, NY 10026

Alteration filing in Harlem (South), Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 26, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01086021-I1

1871 Adam Clayton Powell Jr Boulevard

Manhattan, NY 10026

Alteration filing · status dated Sep 24, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
35
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01086021-I1 as a alteration filing at 1871 Adam Clayton Powell Jr Boulevard, Manhattan, NY 10026. Its latest published status category is Recorded as completed, dated Sep 24, 2026. The filing records 35 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 24, 2026
Proposed scale
35 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1055033Applicant of recordSee the 162 filings that name Msm Engineering Services, PLLC
FiledJul 26, 2024
Current recordRecorded as completed
Proposed scale35 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of temporary light duty pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the NYC building code. no change in use, occupancy, or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story elevator apartment building built in 1925, with 35 homes, on a 5,046 sq ft lot.

Built
1925
Last altered
1988
Floors
7
Residential units
35
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-2
Lot area
5,046 sq ft
Building area
31,220 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 29 notices on file; the most recent was issued Dec 11, 2024.

  • Fail to certify class

    Issued Dec 11, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Fail to certify class

    Issued Oct 2, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Immediate

    Issued Jun 24, 2024 — REMEDY: PROVIDE APPROXIMATELY 110 LINEAR FEET OF SIDEWALK SHED AT EXPOSURE 2-NORTH ELEVATION (ALONG WEST ST.) AS PER 1 RCNY 103.4

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01086021-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01086021-I1
BBL
1018230061
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
35
Proposed dwelling units
35
Scaffolding