What the filing says
A public-record reading of the proposed work.
Interior renovation of apt 6bc. partition changes to non-load-bearing walls as per plans. no change in use, occupancy, or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 31-story condominium built in 1986, with 97 homes, on a 7,531 sq ft lot.
- Built
- 1986
- Floors
- 31
- Residential units
- 97
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C1-9
- Lot area
- 7,531 sq ft
- Building area
- 124,816 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 34 notices on file; the most recent was issued Feb 7, 2000.
- Local law 62/91 - boilers
Issued Feb 7, 2000
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01445628-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01445628-I1
- BIN
- 1042610
- BBL
- 1014047503
- Postal code
- 10021 · 321 filings
- Review type
- Standard Plan Examination
- Existing stories
- 33
- Proposed stories
- 33
- Existing dwelling units
- 114
- Proposed dwelling units
- 114








