What the filing says
A public-record reading of the proposed work.
Emergency work to remove fire-damaged debris and associated work to construct a temporary wood-framed roof structure
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story walk-up apartment building built in 1901, with 3 homes, on a 2,400 sq ft lot.
- Built
- 1901
- Floors
- 2
- Residential units
- 3
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7A
- Lot area
- 2,400 sq ft
- Building area
- 3,420 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Jun 18, 2026.
- Construction
Issued Jun 18, 2026 — EMERGENCY WORK ORDER.THE BLDG SUSTAIND SEVERE FIRE DMG DUE TO FIRE ON 6/17/26.APPROX 8%ROOF SEVERELY DMGD W/AREAS OF PRTLLY CLLPSD FRAMNG EXP1 EALL CORNICE PRTLLY CLLPSD&THE REMAIND OF CORNICE.OWNR TO IMMED RTAIN DOB REG GC TO INSTLL U-SHAPE TIGHTBOARD CNSTRCTN FENCE@FRNT OF THE BLDG MIN 20FT FRM THE FRNT WALL
- Construction
Issued Jun 18, 2026 — EMERGENCY WORK ORDER.THE BLDG SUSTAIND SEVERE FIRE DMG DUE TO FIRE ON 6/18/26.APPROX 80%ROOF SEVERELY DMGD W/AREAS OF PRTLLY CLLPSD FRAMNG; EXP1 WALL CORNICE PRTLLY CLLPSD&EXT WALL@EXP1 INADEQUATELY BRCD.OWNR TO IMMED FULLY DEMO THE BLDG&GRADE&FENCE SITE.ALL WRK TO BE UNDR DRCT& CONT SPRVSN OF NYSPE.PE TO SBMT MEANS&METHDS
- Construction
Issued Jun 17, 2026 — BUILDING NO LONGER CODE COMPLIANT DUE TO FIRE HAPPENED IN BUILDING 188 AT OCEAN PARKWAY ON BASEMENT LEVEL 1 & 2ND AND 3RD FLOOR, STRUCTURAL DAMAGE TO WOOD FRAMING OF WALLS, CEILING AND ROOF OPEN. FIRE DAMAGE ALONG WITH WATER AND SMOKE DAMAGE TO BUILDING, VACATE DONE FOR FULL BUILDING, NO INJURIES
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01436050-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 62,630 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01436050-P1
- BBL
- 3053380011
- Postal code
- 11218 · 1530 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 2
- Proposed dwelling units
- 2