NYC DOB record · M01327612-S3

1882 3 Avenue

1882 3 Avenue, Manhattan, NY 10029

Alteration filing in East Harlem (South), Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 25, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01327612-S3

1882 3 Avenue

Manhattan, NY 10029

Alteration filing · status dated Sep 23, 2026

Current record
Recorded as completed
Proposed scale
4 stories
Dwelling units
7
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01327612-S3 as a alteration filing at 1882 3 Avenue, Manhattan, NY 10029. Its latest published status category is Recorded as completed, dated Sep 23, 2026. The filing records 4 proposed stories and 7 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 23, 2026
Proposed scale
4 proposed stories and 7 proposed dwelling units
The building, not the filingopen housing violations, what it sold for and every filing at BIN 1051929Applicant of recordSee the 17 filings that name Case Engineering, INC.
FiledApr 21, 2026
Current recordRecorded as completed
Proposed scale4 stories
Recorded cost$15,000

What the filing says

A public-record reading of the proposed work.

Structural work for tenant fit-out of Wingstop restaurant at this location. No change in use, egress or occupancy under this application

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1910, with 9 homes, on a 2,000 sq ft lot.

Built
1910
Last altered
1986
Floors
4
Residential units
9
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
R8A
Lot area
2,000 sq ft
Building area
6,500 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 27 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01327612-S3.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01327612-S3
BBL
1016310040
Review type
Professional Certification
Existing stories
4
Proposed stories
4
Existing dwelling units
7
Proposed dwelling units
7
Structural work