What the filing says
A public-record reading of the proposed work.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story mainly residential with some commercial built in 1900, with 3 homes, on a 1,260 sq ft lot.
- Built
- 1900
- Last altered
- 1985
- Floors
- 4
- Residential units
- 3
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R7A
- Lot area
- 1,260 sq ft
- Building area
- 3,690 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 5 notices on file; the most recent was issued Jul 10, 2026.
- Construction
Issued Jul 10, 2026 — REQUESTING A STRUCTURAL STABILITY REPORT DUE TO CRACKS OBSERVED AT EXPOSURE 1, CRACKS SPAN FROM THE 2ND TO 3RD STORIES WITH CRACK SPANNING ALONG FIRE ESCAPE. DECORATIVE STONE WINDOW LINTELS AT THE 2ND, 3RD, AND 4TH STORIES WERE CRACKED AND IN A STATE OF DISREPAIR.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01450780-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01450780-I1
- BIN
- 1005977
- BBL
- 1004390030
- Postal code
- 10009 · 148 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 3
- Proposed dwelling units
- 3