19-08 Brookhaven Avenue

19-08 Brookhaven Avenue, Queens, NY 11691

Full demolition filing in Far Rockaway-Bayswater, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedFull demolition

NYC Department of Buildings · w9ak-ipjd · accessed Oct 28, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01012870-I1

19-08 Brookhaven Avenue

Queens, NY 11691

Full demolition · status dated Oct 23, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01012870-I1 as a full demolition at 19-08 Brookhaven Avenue, Queens, NY 11691. Its latest published status category is Approved, dated Oct 23, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Full demolition
Latest status
Approved
Latest status date
Oct 23, 2026
Proposed scale
Not stated in this filing
The building, not the filingEvery filing at BIN 4298323, with the parcel and violation recordApplicant of recordSee the 233 filings that name South Bay Engineering PLLC
FiledMar 28, 2024
Current recordApproved
Proposed scaleNot specified
Recorded cost$22,000

What the filing says

A public-record reading of the proposed work.

Full demolition one story structure using hand held and mechanical means to assist

Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01012870-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,944 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01012870-I1
BBL
4155660055
Review type
Standard Plan Examination
Existing stories
1
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source