What the filing says
A public-record reading of the proposed work.
Installation of temporary supported scaffold as per plan. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 17-story elevator apartment building built in 1937, with 34 homes, on a 15,111 sq ft lot.
- Built
- 1937
- Last altered
- 2008
- Floors
- 17
- Residential units
- 34
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- C5-1
- Lot area
- 15,111 sq ft
- Building area
- 188,158 sq ft
- Historic district
- Upper East Side Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 33 notices on file; the most recent was issued Jan 31, 2019.
- No report and / or late filing (facade)
Issued Jan 31, 2019 — FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01378767-P2.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01378767-P2
- BBL
- 1013870014
- Postal code
- 10021 · 414 filings
- Review type
- Professional Certification
- Existing stories
- 16
- Proposed stories
- 16
- Existing dwelling units
- 34
- Proposed dwelling units
- 34








