What the filing says
A public-record reading of the proposed work.
Reframe and infill floor openings at demolished convenience stair as per plans.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story one-family home built in 1896, on a 2,554 sq ft lot.
- Built
- 1896
- Last altered
- 2005
- Floors
- 5
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- C5-1
- Lot area
- 2,554 sq ft
- Building area
- 8,137 sq ft
- Historic district
- Metropolitan Museum Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 15 notices on file; the most recent was issued Nov 14, 2016.
- (private residence) - elevator affirmation of
Issued Nov 14, 2016 — VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
- (other bldgs types) - elevator affirmation of
Issued May 30, 2014 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 1, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01314569-S5.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01314569-S5
- BBL
- 1014940014
- Postal code
- 10028 · 685 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 1
- Proposed dwelling units
- 1








