What the filing says
A public-record reading of the proposed work.
Renovation of an existing apartment# 35B on 35th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 34-story elevator apartment building built in 1962, with 125 homes, on a 28,589 sq ft lot.
- Built
- 1962
- Last altered
- 2011
- Floors
- 34
- Residential units
- 125
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10A
- Lot area
- 28,589 sq ft
- Building area
- 325,680 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 66 notices on file; the most recent was issued Mar 26, 2024.
- Construction
Issued Mar 26, 2024 — FAILURE TO RESPOND TO OBJECTIONS ISSUED FOR TPP AUDIT FOR INADEQUATE TENANT PROTECTION PLAN FOR JOB # M00886107
- (other bldgs types) - elevator affirmation of
Issued Jan 3, 2017 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
- Electric
Issued Jun 3, 1997
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01346775-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01346775-I1
- BBL
- 1014060041
- Postal code
- 10021 · 414 filings
- Review type
- Standard Plan Examination
- Existing stories
- 33
- Proposed stories
- 33
- Existing dwelling units
- 126
- Proposed dwelling units
- 126