NYC DOB record · M01346775-I1

190 East 72 Street

190 East 72 Street, Manhattan, NY 10021

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01346775-I1

190 East 72 Street

Manhattan, NY 10021

Alteration filing · status dated Sep 14, 2026

Current record
Approved
Proposed scale
33 stories
Dwelling units
126
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01346775-I1 as a alteration filing at 190 East 72 Street, Manhattan, NY 10021. Its latest published status category is Approved, dated Sep 14, 2026. The filing records 33 proposed stories and 126 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 14, 2026
Proposed scale
33 proposed stories and 126 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1042818Applicant of recordSee the 4 filings that name Anna Jachnik Architect
FiledFeb 6, 2026
Current recordApproved
Proposed scale33 stories
Recorded cost$128,500

What the filing says

A public-record reading of the proposed work.

Renovation of an existing apartment# 35B on 35th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 34-story elevator apartment building built in 1962, with 125 homes, on a 28,589 sq ft lot.

Built
1962
Last altered
2011
Floors
34
Residential units
125
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10A
Lot area
28,589 sq ft
Building area
325,680 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 66 notices on file; the most recent was issued Mar 26, 2024.

  • Construction

    Issued Mar 26, 2024 — FAILURE TO RESPOND TO OBJECTIONS ISSUED FOR TPP AUDIT FOR INADEQUATE TENANT PROTECTION PLAN FOR JOB # M00886107

  • (other bldgs types) - elevator affirmation of

    Issued Jan 3, 2017 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

  • Electric

    Issued Jun 3, 1997

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01346775-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01346775-I1
BBL
1014060041
Review type
Standard Plan Examination
Existing stories
33
Proposed stories
33
Existing dwelling units
126
Proposed dwelling units
126
General construction