NYC DOB record · X01314162-S2

1908 Muliner Avenue

1908 Muliner Avenue, Bronx, NY 10462

New building filing in Morris Park, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 26, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01314162-S2

1908 Muliner Avenue

Bronx, NY 10462

New building · status dated Oct 23, 2026

Current record
Approved
Proposed scale
2 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01314162-S2 as a new building at 1908 Muliner Avenue, Bronx, NY 10462. Its latest published status category is Approved, dated Oct 23, 2026. The filing records 2 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Oct 23, 2026
Proposed scale
2 proposed stories and 2 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 2131196Applicant of recordSee the 100 filings that name Automated Design Engineering, PLLC
FiledMar 2, 2026
Current recordApproved
Proposed scale2 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Install plumbing system subsequent to GC (-I1) job.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 26, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01314162-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 87,253 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01314162-S2
BBL
Empty in the source
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
2
Existing dwelling units
Empty in the source
Proposed dwelling units
2