What the filing says
A public-record reading of the proposed work.
Cosmetic apartment renovation including kitchen and interior finish upgrades. non-structural work only. not change in use, floor area, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1905, with 20 homes, on a 5,000 sq ft lot.
- Built
- 1905
- Floors
- 5
- Residential units
- 20
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R8
- Lot area
- 5,000 sq ft
- Building area
- 16,790 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 8 notices on file; the most recent was issued Nov 29, 2016.
- Construction
Issued Nov 29, 2016 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. AT THE TIME OF INSPECTION WE OBSERVED THE RETAINING WALL LOCATED AT THE REAR YARD WAS CRACK AND OUT OF PLUMB. ON 2/11/16 VIOLATION WAS ISSUED FOR FAILURE TO MAINTAIN THE STRUCTURE. REMEDY: IMMEDIATELY RETAIN A LIC. DESIGN PROFESSIONAL PROVIDE ENGINEERING ASSESMENT REPORT TO R/W UNIT BY 12/12/2016
- Construction
Issued Feb 11, 2016 — FM STRUCTURE IN A CODE COMPLIANT MANNER. AT REAR YARD, PROPERTY LINE RETAINING WALL IS CRACKED AND OUT OF PLUMB. REMEDY: REQUIRE LICENSED DESIGN PROFESSIONAL TO EVALUATE RETAINING WALL AND SUBMIT REPORT TO FEU BY 6/6/16. CONSTRUCT NEW RETAINING WALL TO BE DESIGNED BY LIC DESIGN PROF. WORK TO START NO LATER THAN 10/25/16
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01397662-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01397662-I1
- BIN
- 1059860
- BBL
- 1019930102
- Postal code
- 10027 · 333 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 16
- Proposed dwelling units
- 16








