NYC DOB record · B00204261-I1

192 Cypress Avenue

192 Cypress Avenue, Brooklyn, NY 11237

Alteration filing in Bushwick (West), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00204261-I1

192 Cypress Avenue

Brooklyn, NY 11237

Alteration filing · status dated Aug 14, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00204261-I1 as a alteration filing at 192 Cypress Avenue, Brooklyn, NY 11237. Its latest published status category is Approved, dated Aug 14, 2026. The filing records 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 14, 2026
Proposed scale
3 proposed dwelling units
The building, not the filingEvery filing at BIN 3074626, with the parcel and violation recordApplicant of recordSee the 790 filings that name Royal Engineering, P.C
FiledAug 3, 2019
Current recordApproved
Proposed scale3 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary heavy duty sidewalk shed and(30'- 52') high pipe scaffold originating (off shed) for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story mainly residential with some commercial built in 1930, on a 1,500 sq ft lot.

Built
1930
Floors
2
Residential units
1
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
1,500 sq ft
Building area
2,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 15 open notices on record for this building, out of 17 notices on file; the most recent was issued Aug 31, 2026.

  • Construction

    Issued Aug 31, 2026 — AT TIME OF INSPECTION,OBSERVED CRACKED AND DAMAGED BRICKS ON EXP1;WIND OW ON SECOND FLOOR OPEN LEFT OPEN;DETERIORATING/DAMAGED ROOF ALLOWING WATER AND OTHER ELEMENTS TO GET IN.FAILURE TO COMPLY TO SECTION 28-301 .1 OF NYC ADMIN CODE.REMEDY:REPAIR AND/OR REPLACE

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Construction

    Issued Apr 30, 2025 — ON 4/23/25 OBSERVED A STALLED CONSTRUCTION SITE W DAMAGED PARTY WALLS , FACADE & ROOF EXPOSED TO ELEMENTS POSING POTENTIAL PUBLIC & PROPERTY HAZARD. REMEDY: NYS RDP TO CREATE SITE-SPECIFIC MONITORING PLAN SUBMIT TO CSENG 5/14/25, AND REPORT ANY HAZARDOUS CONDITIONS

  • 12 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00204261-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00204261-I1
BBL
3032720034
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
3
Proposed dwelling units
3
Sidewalk shedScaffolding