What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed and(30'- 52') high pipe scaffold originating (off shed) for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story mainly residential with some commercial built in 1930, on a 1,500 sq ft lot.
- Built
- 1930
- Floors
- 2
- Residential units
- 1
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R6
- Lot area
- 1,500 sq ft
- Building area
- 2,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 15 open notices on record for this building, out of 17 notices on file; the most recent was issued Aug 31, 2026.
- Construction
Issued Aug 31, 2026 — AT TIME OF INSPECTION,OBSERVED CRACKED AND DAMAGED BRICKS ON EXP1;WIND OW ON SECOND FLOOR OPEN LEFT OPEN;DETERIORATING/DAMAGED ROOF ALLOWING WATER AND OTHER ELEMENTS TO GET IN.FAILURE TO COMPLY TO SECTION 28-301 .1 OF NYC ADMIN CODE.REMEDY:REPAIR AND/OR REPLACE
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued Apr 30, 2025 — ON 4/23/25 OBSERVED A STALLED CONSTRUCTION SITE W DAMAGED PARTY WALLS , FACADE & ROOF EXPOSED TO ELEMENTS POSING POTENTIAL PUBLIC & PROPERTY HAZARD. REMEDY: NYS RDP TO CREATE SITE-SPECIFIC MONITORING PLAN SUBMIT TO CSENG 5/14/25, AND REPORT ANY HAZARDOUS CONDITIONS
12 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00204261-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00204261-I1
- BBL
- 3032720034
- Postal code
- 11237 · 1683 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 3
- Proposed dwelling units
- 3








