What the filing says
A public-record reading of the proposed work.
Filing for interior Mechanical modifications in retail space, including relocations of existing ductwork for new elevator shafts, HVAC to new electrical service rooms, install indoor Air Unit ACR-01 in new Elevator Machine Room.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 30-story elevator apartment building built in 2005, with 229 homes, on a 30,627 sq ft lot.
- Built
- 2005
- Floors
- 30
- Residential units
- 229
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C4-7
- Lot area
- 30,627 sq ft
- Building area
- 377,564 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 166 notices on file; the most recent was issued Mar 9, 2012.
- Elevator
Issued Mar 9, 2012
- Elevator
Issued Mar 9, 2012
- Local law 10/81 -
Issued Jan 13, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 6, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01413407-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01413407-S2
- BBL
- 1011170001
- Postal code
- 10023 · 618 filings
- Review type
- Professional Certification
- Existing stories
- 30
- Proposed stories
- 30
- Existing dwelling units
- 229
- Proposed dwelling units
- 229