What the filing says
A public-record reading of the proposed work.
Cap and remove kitchen sink and stove. legalize 3 piece bathroom in the basement.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 1965, on a 3,390 sq ft lot.
- Built
- 1965
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R5
- Lot area
- 3,390 sq ft
- Building area
- 1,700 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Dec 12, 2023.
- Construction
Issued Dec 12, 2023 — RESIDENCE CONVERTED FROM LEGAL 2 FAMILY TO 3 FAMILY BY CREATING CLASS A APT AT BASEMENT LEVEL.DOB RECORDS INDICATES AS PER C OF O # Q42014 RESIDENCE AS A 2 FAMILY AND NOW CONVERTED AS A 3 FAMILY BY CREATING CLASS A APT AT BASEMENT LEVEL WITH FULL KITCHEN WITH GAS STOVE, 3 PC BATHROOM, 1 RM FOR SLEEPING QUARTER, LIVING SPACE.VACATE BASEMENT.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01395662-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01395662-I1
- BBL
- 4108230058
- Postal code
- 11423 · 104 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








