NYC DOB record · X01422558-I1

1962 Prospect Avenue

1962 Prospect Avenue, Bronx, NY 10457

New building filing in Tremont, Bronx. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Nov 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01422558-I1

1962 Prospect Avenue

Bronx, NY 10457

New building · status dated Nov 18, 2026

Current record
Approved
Proposed scale
9 stories
Dwelling units
99
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01422558-I1 as a new building at 1962 Prospect Avenue, Bronx, NY 10457. Its latest published status category is Approved, dated Nov 18, 2026. The filing records 9 proposed stories and 99 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Nov 18, 2026
Proposed scale
9 proposed stories and 99 proposed dwelling units
Applicant of recordSee the 66 filings that name Badaly Architects
FiledJul 14, 2026
Current recordApproved
Proposed scale9 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Proposed new 99 unit group ii apartment building. three tax lots on one zoning lot. 9-story with cellar. construction class i-b.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01422558-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 98,351 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01422558-I1
BIN
2131330
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
9
Existing dwelling units
Empty in the source
Proposed dwelling units
99
General construction