NYC DOB record · S00795855-I1

197 Meisner Avenue

197 Meisner Avenue, Staten Island, NY 10306

New building filing in Todt Hill-Emerson Hill-Lighthouse Hill-Manor Heights, Staten Island. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Nov 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S00795855-I1

197 Meisner Avenue

Staten Island, NY 10306

New building · status dated Nov 10, 2026

Current record
Approved
Proposed scale
3 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S00795855-I1 as a new building at 197 Meisner Avenue, Staten Island, NY 10306. Its latest published status category is Approved, dated Nov 10, 2026. The filing records 3 proposed stories and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Nov 10, 2026
Proposed scale
3 proposed stories and 1 proposed dwelling unit
Applicant of recordSee the 21 filings that name Ronald D.VICTORIO R.A.
FiledSep 7, 2022
Current recordApproved
Proposed scale3 stories
Recorded cost$500,000

What the filing says

A public-record reading of the proposed work.

PAA P2 filed with revised site plan to indicate relocation of storm water drywells and septic system with leaching field in accordance with the approved Site Connection Proposal Project ID # 2310/22 which was previously uploaded into the system.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story one-family home built in 2023, on a 20,000 sq ft lot.

Built
2023
Floors
3
Residential units
1
Building type
One-family home
Land use
One and two family homes
Zoning district
R1-2
Lot area
20,000 sq ft
Building area
9,694 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S00795855-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,779 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S00795855-I1
BIN
5172226
BBL
5023060079
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
3
Existing dwelling units
Empty in the source
Proposed dwelling units
1
General constructionFoundation workEarthwork