NYC DOB record · X01371083-I1

1975 Lafontaine Avenue

1975 Lafontaine Avenue, Bronx, NY 10457

Alteration filing in Tremont, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01371083-I1

1975 Lafontaine Avenue

Bronx, NY 10457

Alteration filing · status dated Sep 30, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
50
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01371083-I1 as a alteration filing at 1975 Lafontaine Avenue, Bronx, NY 10457. Its latest published status category is Approved, dated Sep 30, 2026. The filing records 6 proposed stories and 50 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 30, 2026
Proposed scale
6 proposed stories and 50 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 2011827Applicant of recordSee the 5 filings that name Dennis V. Panettieri, Architect
FiledMar 17, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$350,000

What the filing says

A public-record reading of the proposed work.

General construction work to renovate 10 existing apartments work include removal of existing partitions,existing bathroom and existing kitchen in the "a" and "b" apartments on the second thru sixth floors to facilitate reconstruction of damage stru. paa

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1923, with 50 homes, on a 12,500 sq ft lot.

Built
1923
Floors
5
Residential units
50
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
C4-5X
Lot area
12,500 sq ft
Building area
48,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 9 open notices on record for this building, out of 12 notices on file; the most recent was issued Jul 17, 2026.

  • Construction

    Issued Jul 17, 2026 — FTM. OBSERVED ON EXP 1 CRACKS ON BRICKS PARAPET, AC UNITS INADEQTE SUPPORTED; BROKEN WINDOW PANE ON SEVERAL FLRS. EXP 2,3,4 CRACKS IN BRICK SPANDRELS, AC UNITS INADEQTE SUPPORTED, BROKEN WINDOW PANES @ SEVERAL LOCATNS. EXP 4 CRACKS & SPALLING STUCCO & BRICKS @ MULTIPLE LOCATIONS. REMEDY: REPAIR AND/OR REPLACE ALL DAMAGED FACADE & APPURT

  • Construction

    Issued Oct 15, 2025 — FTM BLDG. OBSERVED AT EXPOSURE 1 EAST ELEVATION DAMAGE JOINTS AT SOUTH ENTRANCE, CRACK COUNTYARD NORTH, CRACKS ON ELEVATIONS 1ST FLOOR AND UPPER FLOOR. MISSING WINDOW SASH/PANE BROKEN PANE NORTH. BROKEN PANE EXPOSURE 2 CORROSION OF FIRE ESCAPE EXPOSURE 3. REMEDY: REPAIR AND OR REPLACE

  • Construction

    Issued Oct 15, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED DAMAGED JOINTS AT BUILDING ENTRANCE CANOPY.EXP2 LONG VERTICAL CRACK 1ST FL.CR ACKS AT UPPER FLOORS.DEFECTED FIRE ESCAPE EXP1 AND 2,CRACK/BROKEN WIND OW AT EXP2.REMEDY:REPAIR AND/OR REPLACE

  • 6 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 1, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01371083-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01371083-I1
BBL
2030600045
Review type
Professional Certification
Existing stories
6
Proposed stories
6
Existing dwelling units
50
Proposed dwelling units
50
General construction